Clifton Cay, New Providence Island (Nassau), Bahamas

1998: Design of beach enhancement along 8,000-ft shoreline, including two community beach parks with
stabilizing rock groins. Prepare environmental assessment
Client: Clifton Cay Development Company.

Cocoa Beach, Florida

1996: 40,000 c.y. truck-haul placed on 5000 ft
of downtown shorefront as interim beach
nourishment measure.
Design, permitting, construction-review,
Engineer-of-Record.
Client: Canaveral Port Authority.
Fisher Island, Dade County, Florida

1991: 25,000 c.y. of imported Bahamian
aragonite sand, with 8 stabilizing rock
groin structures.
Design, permitting, construction-
review, monitoring, Engineer-of-Record.
Client: Island Developers, Ltd.

Frozen & Alder Cay, Bahamas

1994-01: Reclamation of relic salt pond to
create 3-acre swim-in lagoon with
beaches and coral/fish aquaria.
Design, construction review, Engineer
of Record.
Client: Private development.
Ft. Clinch, Nassau County, Florida

2001: Rehabilitation of historical rock
groins, construction of new T-head
groins, and placement of sand for
beach enhancement at a historic
preservation site (c. 1880’s).
Design, permitting, construction review.
Client: Florida Park Service.