| Lyford
Cay, Nassau, Bahamas 1995-96: 7,000 c.y. beach fill and four T-head rock groins at residence of D. Izmirlian. 5,000 c.y. beach fill and two stabilizing rock groins at residence of R. Arnold. 1997: 2,500 c.y. beach fill and threestabilizing rock structures at residence of M. Barosso. 1999-00: 2,500 c.y. beach fill and multiple stabilizing structures at residences of L. Vazquez and M. Dingman. Beach and lagoon improvements for P. Nygard. Design, construction review; Engineer of Record. |
![]() |
![]() |
Montego
Bay, Rose Hall, Jamaica 1999: 5,000 c.y. of reclaimed sand, 2 terminal groins and breakwater, to create recreational beach for Ritz Carlton resort. Design, construction review; Engr. of Record. Client: Ritz Carlton |
| Myrtle
Beach, South Carolina 1987: 900,000 c.y. (truck-haul), 9 miles. Locally funded. Co-design, permitting, constr. review; Engr. of Record. Client: Town of Myrtle Beach, SC |
|
|
Ocean
Ridge, Palm Beach County, FL
1998: 800,000 c.y. placed along 1.4 miles from an offshore sand source between coral reefs, with 8 stablizing structures; local, State, and federal funds. General Design Memorandum, design, permitting, and construction review. Client: Palm Beach County, Dept. of Env. Res. Mgt. |
![]() |