Lyford Cay, Nassau, Bahamas

1995-96: 7,000 c.y. beach fill and four T-head rock groins at residence of D. Izmirlian. 5,000 c.y. beach fill and two stabilizing rock groins at residence of R. Arnold.
1997: 2,500 c.y. beach fill and threestabilizing rock structures at residence of M. Barosso.
1999-00: 2,500 c.y. beach fill and multiple
stabilizing structures at residences
of L. Vazquez and M. Dingman. Beach
and lagoon improvements for P. Nygard.
Design, construction review;
Engineer of Record.

Montego Bay, Rose Hall, Jamaica

1999: 5,000 c.y. of reclaimed sand, 2 terminal
groins and breakwater, to create recreational
beach for Ritz Carlton resort.
Design, construction review; Engr. of Record.
Client: Ritz Carlton
Myrtle Beach, South Carolina

1987: 900,000 c.y. (truck-haul), 9 miles.
Locally funded.
Co-design, permitting, constr. review; Engr. of Record.
Client: Town of Myrtle Beach, SC

Ocean Ridge, Palm Beach County, FL

1998: 800,000 c.y. placed along 1.4 miles from
an offshore sand source between coral reefs,
with 8 stablizing structures; local, State, and
federal funds.
General Design Memorandum, design,
permitting, and construction review.
Client: Palm Beach County, Dept. of Env. Res. Mgt.