Palmas del Mar, Puerto Rico

1995-present: Beach fill and structural stabilization along 800 m at Punta Candelero
Privately funded.
Design, permitting.
Client: Palmas del Mar Resort

Patrick Air Force Base, Florida

1996-98: 150,000 c.y. (truck-haul) along 1.5 miles,
plus buried rock revetment within dune to protect
oceanfront missile-range tracking facility.
2000-01: 600,000 c.y. from offshore sand source
along 3 miles. Fast-track schedule; design-build
contract with AMEC and Great Lakes D&D Co.
Design, permitting, constr. review; Eng. of Record.
Client: AMEC Earth & Environmental; U. S. Air Force.
Pensacola Beach, Florida

2000-02: 4,000,000 c.y. along 8 miles from offshore sand sources. (Construction in 2002).
Design, permitting, construction management; Engineer Of Record.
Client: Santa Rosa Island Authority.

Pirates Cove, Paradise Island, Bahamas

1999-00: Remove seawalls, restore 1 km of
resort beach, construct buried breakwater
to repair breach in island spit.

Design, construction review; Engr. Of Record
Client: Sun International, Ltd
.

Pre-Project
Post-Project